New Base Cabinets Finally!

(Sorry this post was delayed.  So many things have happened and seems it was hard to keep up with it all.)

Well it finally time to make some much needed progress. Living over a week without a kitchen sink or dishwasher was awful!

The plywood was put on top of the base cabinets by the cabinet maker. Then it was my turn to make magic happen. It was a hard choice, I knew it was white subway tile, with black counters. I went through all the options of Soap stone, but that bid was more than almost all the kitchen. Then solid black honed granite, well that was pretty much over the budget too…..What’s a girl to do?

image

Never fear and as a budget designer I knew I could find a solution. First my cabinet maker had an idea for an industrial grade Formica counter. He even ordered a sample and mocked up a sample. Of course for the life of me I can’t find the photo! It is a solid color thru product used in labs. It was matte black and if it chipped or got cut it was black completely inside so it would never show. Sounds appealing. But not sure a big plus for a buyer who might not be as welcoming to a new custom kitchen with Formica counters.

(You can read about it here)

Along came granite tiles with a rounded edge already applied. These are called Lazy Granite and are 12×12 tiles and you could order any configuration to cover your countertop and it would have an edge already on it. However this kitchen has so many corners and edges that it made this product more expensive than it should have been.

image

Seriously it shouldn’t be this hard! So with a little investigation and clever frugal mind I came up with a solution!

image

Black granite tile with a black ceramic edge. Wait, give it a look before you judge it. It was budget friendly, fit with the vintage look of the overall kitchen theme and was a DIY project I could do myself, which meant further savings.

image

The ceramic edges were installed upside down, for lack of a better description. They went around the edges, with the granite as the filler. Black grout used to make a flawless finish and voila the perfect Vintage counter was born.

image

The backsplash was traditional white subway tile with a black accent line of vintage goodness.

image

image

We we used the top of the bed posts as legs on the base cabinets. Also some quarter round.

image

image

And you you remember the sink base legs from the footboard of the bed.

image

It is so nice to have the cabinets in. Now for the uppers!

Hugs,

image

Mid Century Bath #5

Well sorry it has taken me soooo long to get these posts out. Once the storm broke I was able to make a flying trip home. Had several problems going on which needed my full attention.

Taxes, family in the hospital, responses to advertisements, and the list goes on. Everything has settled down some now, but I’m sure as with life I’ll be converged upon in the near future with more items that a need my immediate attention. plus a few big changes in the future too.

So the bathroom is almost complete. I must say it turned out wonderful.

Here’s a little comparison.

image

Before

image

After, the mirror is just temporary in its placement. They will be going for a larger horizontal one with a wood frame.

image

Another after

image

Before of the awkward tub niche.

image

This is is after the grout but before new shower hardware is installed. The photo does not do this area justice. These are an Almond 2X4 subway tile. This area isn’t finished yet, but hoping you can get an idea of the transformation. It is a big change in the before so and afters. They seem to love the way it turned out. The next time I’m up there I will shoot the finished photos to share.

Hugs,

image

Snow Bound and Mid Century Update

So when I came up here to Portland for this design job I had a few other reasons to visit. First of course was the bathroom design, also to see family and friends, do a little thrifting, and salvage. Pick up a gently used new to me car. And to celebrate my Birthday. I’ve done a little of all those things, but would have done more if I hadn’t got caught in a snow and ice storm! So the bathroom design was a several day process working with the clients.

image

A day with a good friend doing some salvage.

image

I found some great pieces for a couple of projects.

image

Drove a new car.

image

Made progress on the bathroom remodel.

image

Had a wonderful Birthday dinner.

image

With family and friends!

image

Tried to get places during a terrible storm for supplies during some crazy weather!

image

Unable to drive due the weather. Have to depend on a SUV ride. But enjoying the peaceful snowfall and beauty too.

image

So wonderful at dusk the sight of the new fallen snow. However I’m ready for our rain to return. And to be able to drive again!

Hugs,

image

Paint and Tile for Mid Century Redo

We are coming along.

The paint chosen for the walls and ceiling is Toasted Almond.

image

The feature wall behind the vanity is Amazon Jungle.

image

The paint is still wet in this photo.

The floor is laid, we used a porcelain tile that looks like wood. It isn’t grouted yet, since it takes a while to cure. 24 hours to be exact. We wanted to get a few things done before.

image

Cant wait to show you it when it is grouted.

Also some progress on the shower wall surround was made.

image

The he Hardibacker was hung.

image

Seams were secured and taped. We are making some good progress now.

Stay tuned for more exciting progress.

Hugs,

image

Mid Century Bath Drywall Repair

If you have been following along on this Mid Century design remodel you know it has been torn out.  Lots of fun and necessary changes are happening.

Before Here

Demo Here

Plumbing and drywall are the words right now. The bones of the project. Yeah! They  are the “have to’s”  before you start seeing the new look coming. Yesterday the walls were repaired and patched. The plumbing are for the new shower was started.

As you remember there was damage to the walls were the backsplash tile, recessed toilet paper holder, and part of the tub surround was removed. It isn’t necessary in some cases to remove the drywall and replace. You can achieve a flawless repair if you take your time and work slow.

image

Sorry I missed the photos so hope this makes sense? The hole in the wall will be a separate post, on how to patch holes.

The wall was scraped of loose paper, and remaining adhesive. There was damage and gouges. then the area was sanded with a palm sander to remove any small loose paper or materials.

The area was then painted with a coat of Oil Based 30min dry time primer.

image

Once this dried, a skim coat of drywall mud was ran over the surface. This was applied with a board knife.

image

The edges are wiped up, with a damp cloth as not to cover some of the existing texture this was allowed to dry completely and then sanded.

image

Followed again by another thin coat of “mud” which is allowed to dry, and sanded again.

image

After a good sanding and wipe down. Canned texture is applied. It is best to spray tests on an old piece of cardboard to get the right match of texture. There is a dial on the spout that can be turned from light, medium, or heavy.

image

Once you get the size of spray, you start off the wall and apply in circular motion to get the desired area covered. Less is more as you can add additional if needed.

image

Sorry about these photos, blurry, and not very good, but hope you get the idea. I shot them with my phone.

You let the texture dry completely. The use the broad knife again to knock off the tops of the texture bumps. This will fall to the floor like powdered sugar!

image

You may have to repeat to fill in missed spots or get the desired texture. After it has dried and tops knocked off, you need to prime it all again. When you have existing paint on the walls you have patched, feather the dry roller onto these areas so your new paint will adhere and look good.

The plumbing is in, and tested.

Yes! now we are ready for paint & tile.

Hugs,

image

Re-design of a Mid Century Bathroom

imageSo this is a design job for a Mid Century Bathroom. 1968 to be exact. This young couple just bought their first home and are faced with the main bathroom stuck back in the past. Not only components of the 60’s but some upgrades from the early 90’s as well. They want to honor the design but need a second shower to make this functional.

image

For some odd reason there is a niche and cupboard above the tub that you can only use if you are standing in the tub. Everything seems solid, but we need to gut the shower to make it ready for the new tile around the tub and install plumbing to create the shower head.

It has been a process to help them decide on the choices of materials for this update. They needed to pick out tile for shower surround, floor tile, new vanity, paint, counter and sink, lighting and faucets. As with any young couple they want  it to look like a dream photo they have found but with the budget, cannot have the amount or certain materials that they want. It is all about compromise.

I put together some samples after talking with them about their likes and colors. What I got from them was dark cabinet, mosaic tile behind a free-standing or stand alone vanity.  Nickel or pewter colored fixtures, tub to ceiling tile with inset of mosaic tile, dark wood look ceramic floor. Paint that could match all the existing house that the interior has recently been painted. And possibly tiled wainscoting. All this on a rather small budget for materials and labor.

Tub surround, subway which was requested. In almond not white.

Tub surround, subway which was requested. In almond not white.

Mosaic, subway and floor tile in wood look.

Mosaic, subway and floor tile in wood look.

Vanity request, with open shelves for baskets.

Vanity request, with open shelves for baskets.

image

image

After presenting them with photos, samples and cost or materials and labor. Changes happened to get closer to budget and what they really wanted. I eliminated the ceiling lights and wainscoting right off, knowing that the budget wouldn’t support that.

It was decided to eliminate the entire wall being mosaic tile behind the vanity, changed the subway tile surround to a smaller connected tile at a greatly reduced price but still achieve the desired look. Add a larger vanity when presented with photos of one. Also add a feature wall behind vanity with a different paint color, and additionally may add some mosaics above vanity when it gets closer to the finish.

The toilet is newer so it will be reset. Also the client will do the shower demo himself which has begun.

It is fun to see them shopping for materials and changing their minds after seeing different materials when we went to purchase the components.

updates will be coming…….

Hugs,

image

Upper Cabinet Installation

So we left off with the walls being done at this point. Click here to see the wall post. So since the cabinet maker had the shells of the uppers done, and I had finished painting the uppers will get installed before the lowers.

I guess I should give you a little back story.  This part of a kitchen remodel is “compromise” yes that is the name of the game. You have a mental photo or dream in your head for the space. But in all actuality it will look very close but you will have to compromise at some point in the details. This might be due to budget, or unforeseen problem your space will throw at you. This could be a major wiring in the way, to support beams, and sometimes just a few inches can make or break an idea or plan.

image

So far I’ve had two compromises. The first was the old panty area, which now will hold the supersized refridgerator.  Then due to this it would have been major problem to remove the soffits, so they remained and we even have to change them up and extend them.

image

Here the soffit is already altered. The corner cabinet, and vintage inspired curved shelves were on my list! The other side was to either have a matching curved shelf or not one at all and the wall completely tiled.

image

Then I lost my open shelf and wall concept above the range and to the sides. To the right one open shelf was to house the microwave, since things shifted to the left and right something in the center had to go, and it was the microwave shelf. Now the range hood is to be built in and become a focal point structure. Which is now looking pretty slim of becoming a reality.

image

So the new cabinet has bead board  in the back. This is due to the fact it will have glass doors and contain dishes.

So we are on a roll. No shelves and have install the doors. But it’s looking more like a kitchen everyday.

The next step the kitchen sink!

Hugs,

image